Construction began 1995
Opening date 2000
Construction cost $36,268,726 (dam and related works)
$ 9,067,185 (access and service road)
Dam and spillways
Height 25 m
Length 404 m
Base width 201 m
Impounds Kihansi River
Reservoir
Creates Kihansi Reservoir
Capacity 0.001 km3 (810 acre·ft)
Surface area .1 square miles (0.26 km2)[1]
Power station
Turbines 3 Main
Installed capacity 180 MW
Maximum capacity 300 MW[2]
Annual generation 340 GWh

Kihansi Dam is a hydroelectric dam located on the Kihansi River at the end of the Kihansi Gorge before the convergence with the Ulanga River in Tanzania approximately 450 km southwest of the capital Dar Es Salaam.

Contents

Kihansi Dam

The Kihansi Dam is a concrete gravity dam owned by the Tanzania Electric Supply Company Limited. Its construction began in July 1995 and was opened by President Benjamin W. Mkapa on 10 July 2000. It cost $36 million. Its installed capacity is 180 MW, and it helps provide aproximently 13% of the total electrical power in Tanzania.[1][3][4]

Environmental Impact

The Kihansi Dam destroyed an 800m-high waterfall, affected over 20,000 villagers, and was directly responsible for the extinction in the wild of the Kihansi Spray Toad. The dam reduced the amount of silt and water coming down from the waterfall into the gorge by 90 percent. This led to the spray toad's microhabitat being compromised, as it reduced the amount of water spray, which the toads were directly reliant on for oxygen. This also meant that the toad may have been more susceptible to a chytrid fungus, which was believed to have been transported to the area by conservationists' boots. This chytridiomycosis, which in 2003 was confirmed to be in dead animals of the species, was possibly responsible for the sudden population crash after the world's largest sprinkler system was installed in that area in August 2003. This system was installed to try and conserve the toad species from becoming extinct in the wild, but did not succeed.[2][5]

See also

References

  1. ^ a b "Lower Kihansi Hydropower Dam and Reservoir Project, Tanzania". http://www.water-technology.net/projects/kihansi/. 
  2. ^ a b "Lower Kihansi Hydropower Project, Tanzania". London: Net Resources International. January 2001. http://www.power-technology.com/projects/kihansi/. Retrieved 2010-05-16. 
  3. ^ Myrvoll, Frank; S. B. Hansen , J. A. Roti , and A. Halvorsen (2003). Frank Myrvoll. ed. Field Measurements in Geomechanics. Taylor & Francis. pp. 245–254. ISBN 978-90-5809-602-9. http://www.crcnetbase.com/doi/abs/10.1201/9781439833483.ch31. Retrieved 2010-05-16. 
  4. ^ Pierre Julien; Seema Shah (2005-11-01). "Sedimentation Initiatives in Developing Countries". UNESCO. pp. 29–31. http://www.irtces.org/isi/isi_document/Top20-Draft-Report-Nov-05.pdf. Retrieved 2010-05-16. 
  5. ^ "Species' extinction threat grows". BBC. 2009-11-03. http://news.bbc.co.uk/2/hi/science/nature/8338880.stm. Retrieved 2010-05-07.